Masonry quote example
Mr. Garnier — Load-bearing wall opening + steel lintel
Versailles · old house · 220 × 210 opening, 35 cm stone wall
| Désignation | Qté | P. U. | Total |
|---|---|---|---|
| Load study + tile strip on both sides | 1 lump | €480 | €480 |
| Create opening (sawing + stone demolition) | 4.6 m² | €180 | €828 |
| IPN 200 lintel (supply + install + bedding) | 2.4 m | €380 | €912 |
| Reveal repairs + cement render | 6 m | €85 | €510 |
| Rubble removal (7 m³ skip) | 1 | €320 | €320 |
| Propping + site protection | 1 lump | €420 | €420 |
| Subtotal | €3,470 | ||
| VAT 10% (renovation) | €347 | ||
| Total inc. VAT | €3,817 | ||
Voice-captured on site in 1 min 10.